Amtrak on Sept. 5 kicked off construction for its new Connecticut River Bridge along the Northeast Corridor between Old Saybrook and Old Lyme, Conn.; work is expected to conclude by 2031. The O&G/Tutor
The post Amtrak Breaks Ground on $1.3B Connecticut River Bridge Replacement Project appeared first on Railway Age.